Introducing Livops 2.0! Promo codeCEOgives you 8,000 so‘m on your balance.What’s new
Team and billing / Pricing

Team and billing

Pricing

Every price is in credits. 1 credit is 1,000 so'm. Static sites are free, a Telegram bot is 19 credits/mo, an app 39 credits/mo. A plan gives credits for less.

On Livops every price is in credits. 1 credit is 1,000 so’m. Money only buys credits; a running project takes its price off the balance once a month. Static sites are free.

Buying credits

  • In the cabinet, Billing → Buy credits: type how many you need (10 to 5,000) and the price in so’m shows under the box. Quick picks: 50/100/300/1,000.
  • Payment through Payme or Click, in so’m. No card needs to be linked.
  • Once paid, the credits land on the balance. Bought credits never expire.
  • Sometimes there is a campaign that adds a percentage bonus to every purchase. A promo code gives credits or a bonus on the next purchase — enter it on the Billing page.

What a project costs

What A month
Static site Free
Telegram bot 19 credits (19,000 so’m)
Web app or server 39 credits (39,000 so’m)
Database 500 MB Free — one per team
Database 1 GB / 3 GB / 5 GB 9 / 19 / 29 credits
Storage 1 GB Free — one per team
Storage 5 GB / 25 GB / 100 GB 15 / 49 / 149 credits

Each project is charged once a month from the day it was added. Staging and other environments cost half. Current prices are always in the cabinet.

Plans

A plan is a monthly price that gives you more credits than it costs. So the same usage is always cheaper on a plan.

Free Hobby Pro Team
Price, a month 0 49 credits 179 credits 459 credits
In so’m 0 49,000 so’m 179,000 so’m 459,000 so’m
Credits it gives a month — 75 300 900
Static sites 30 50 100 300
Team members 3 5 10 30
Builds at once 2 3 4 6
Builds a day 30 60 100 200
Builds a month 40 150 400 1,000
Assistant questions a month 20 100 300 1,000
Form submissions a month 100 5,000 5,000 5,000
Full analytics — yes yes yes
  • A plan’s month is paid from bought credits — never from the plan’s own credits or from gifted ones.
  • The plan’s credits are spent first. What is left lasts one more month, then expires.
  • Moving up works at once. Mid-month, the price difference for the days left is charged and the same share of the credit difference is added.
  • Moving down happens when the paid month ends.
  • If a plan’s month goes unpaid, after the grace period the account moves to Free. Nothing is switched off: projects keep running on credits.
  • If a plan’s price goes up, an account that chose it before keeps the old price and still gets the full credits.
  • An account that paid without a plan keeps Hobby’s limits.

Past the limits

If a plan’s allowance runs out before the month does, the next ones come off the credits:

  • 5 assistant questions — 1 credit;
  • each build — 1 credit;
  • 100 form submissions — 1 credit.

With no credits left these stop: “Out of credits — top up”. Free things keep working.

When credits run out

  • If a running project’s month cannot be taken because the credits are short, we wait 3 days as before, then the project is stopped. Databases are not deleted.
  • Buy credits and stopped projects start again by themselves — no rebuild needed.
  • When the credits will last about a week, you get a notification and a Telegram message.

No trial period

There is no free trial period. Static sites are always free; bots and applications run once there are credits.

The 15-minute demonstration

On an account that has not paid yet, the first paid app (a bot or an application) runs for 15 minutes even on a zero balance — so you can see it work. It is not a trial: once, for one app.

  • The project page shows “Demonstration mode” and the time left; at the start and about 3 minutes before the end you get a notification and a Telegram message.
  • Buy credits in that time and the app keeps running without a stop.
  • If not, after 15 minutes the app stops and waits — when credits arrive it starts by itself, no rebuild needed.
  • Databases and storage are not part of the demonstration: they start once there are credits.
  • Ready-made apps from templates (n8n, Ghost, Umami…) are not part of it either: they are known to work and most need a database, so they start after the first payment. They do not use up your demonstration.

Old balances

A so’m balance from before October 2026 was converted to credits exactly: 1 000 so’m = 1 credit, remainders kept (12 345 so’m became 12.345 credits). A plan price agreed earlier is kept.

Need many projects or have a question? Write to @livops_uz.

Got a question? — @livops_uz